Solar Panels
Today the 12 of the 14 solar panels were installed. Two of the panels were damaged in shipping so the final two will be installed next Tuesday. Aren't these beautiful? I can't believe some HOAs do not allow this.
Three steps left: 1) hook up the panels to a meter, 2) send out an electrical inspector to sign off, 3) PNM (the electric company) will come out and sign off on it -then set up our REC contract. I expect the process to be completed in a month.